The main assembly was finished in december 2011. By Mid of April 2012 the Thermooil Piping was finished. At the moment the works on the cabling and the insulation are going on. At the same time the quality of the installation is been controlled according to the quality stamdards of VAS. The commissioning of this plant is been planned now.